system: Southern
client: Railtrack
provision: Upgrade to Stewarts Lane Depot, London
completed: 1998
In 1998, Railtrack awarded D&P a contract to manage the upgrade of the Stewarts Lane Depot in London. The scope of work included management of the selection of suppliers, budget development, design, manufacture, installation, commissioning, testing and supply of Operation and Maintenance (O&M) Manuals.
The equipment upgraded included:
client: Railtrack
provision: Upgrade to Stewarts Lane Depot, London
completed: 1998

The equipment upgraded included:
- CET facility
- Carriage washing plant
- Compressed air system
- Overhead trolley system (stinger)