system: Manila Light Rail Transit System (LRT), the Philippines
client: Mitsubishi Heavy Industries Ltd
provision: LRT3 - Rail Maintenance Depot Equipment
completed: February 2000
This contract for the Manila LRT was for the provision of all rolling stock maintenance equipment including:
Completion was in February 2000. Installation of the equipment commenced in March 1999 and a dedicated Engineer was based in Manila supervising the installation, commissioning and testing of the equipment. He then completed the training.
Equipment supplied:
client: Mitsubishi Heavy Industries Ltd
provision: LRT3 - Rail Maintenance Depot Equipment
completed: February 2000
This contract for the Manila LRT was for the provision of all rolling stock maintenance equipment including:
- Design
- Manufacture
- Works testing
- Tropical export packing
- Delivery FOB
- Installation supervision
- Commissioning
- Training
- Warranty support
Completion was in February 2000. Installation of the equipment commenced in March 1999 and a dedicated Engineer was based in Manila supervising the installation, commissioning and testing of the equipment. He then completed the training.
Equipment supplied:
- Underfloor wheel lathe
- Car progressor
- Bogie repair hoists (x 4
- Bogie turntable (electric) (x8
- Car hoist and body stands (x4 sets
- Mobile lifting jacks (set of 12
- Car stand (48
- Wheel remover
- 150 tonne wheel press
- Re-railing equipment
- Road/rail vehicle for re-railing/rescue
- Overhead cranes
- Jib cranes
- All machine tools
- Storage racks including a vertical storage carousel
- Compressed air system
- Undercar blowdown system
- Waste oil system
- Train washing plant
- Fork lift trucks
- Reach trucks
- Scissor lift tables
- All other minor maintenance and welding equipment and hand tools