system: Manila Light Rail Transit System (LRT), the Philippines
client: Mitsubishi Heavy Industries Ltd
provision: LRT3 -  Track and OCS Maintenance Equipment
completed: May 2000

This contract for the Manila LRT was for the provision of all maintenance equipment to maintain the track and Overhead Catenary System.

Equipment supplied:

Track:
  • Tamping, levelling and lining machine
  • Track geometry measuring trolley
  • Ultrasonic testers for rail and joints
  • Road/rail vehicle with crane
  • Track crew wagon
  • Ballast tampers (kango hammers) and generator
  • Flood light sets and generator
  • Hydraulic rail tensors
  • Switch rail bender
  • All other miscellaneous track maintenance equipment

OCS:
  • Road/rail installation vehicle
  • Road/rail trailer for cable drums
  • All other miscellaneous OCS maintenance equipment

Contact Information

Phone: +44 (0) 2380 277910
Fax: +44 (0) 2380 277920
This email address is being protected from spambots. You need JavaScript enabled to view it.

No.2 Manor Farm, Flexford Road
North Baddesley
Hampshire
England
SO52 9DF

Follow Us





© 2014 Design & Projects Int Limited Ltd All Rights Reserved. - Website Designed by Akira Studio Ltd.