system: Nottingham Express Transit (NET)
client: Bombardier Transportation
provision: Maintenance Depot
completed: 2003
This contract was for the provision of all rolling stock maintenance equipment for this light-rail tramway including, design, manufacture, works testing, delivery, installation, commissioning and warranty support.
The project commenced on April 1 2000 and included the following equipment:
client: Bombardier Transportation
provision: Maintenance Depot
completed: 2003
This contract was for the provision of all rolling stock maintenance equipment for this light-rail tramway including, design, manufacture, works testing, delivery, installation, commissioning and warranty support.
The project commenced on April 1 2000 and included the following equipment:
- Train wash
- Other cleaning equipment
- Underfloor lifting plant
- Bridge crane
- Fork lift truck
- Windscreen remover
- Accommodation bogies
- Bogie testing jack
- Various access platforms and staging
- Underfloor wheel lathe
- Sand filling plant
- Remote controlled shunter
- Safety interlock system
- Various machine tools
- Paint booth
- ACU charge & reclaim trolley
- Refrigerant leak detector
- All hand tools
- All welding equipment
- Battery charger
- Electrical instruments
- Road/rail vehicle with crane
- Re-railing equipment
- Workshop vehicle
- Overhead line inspection equipment